Serving Marlborough, Acton, Sudbury, Littleton, Quincy, Methuen, Boston, Somerville & Greater Boston, MA
Somerville, Massachusetts

Structural & Civil Engineering in Somerville

Lebra Engineering & Design has completed 10 projects in Somerville between 2022 and 2025. Every drawing that needs one is stamped by a Massachusetts-licensed Professional Engineer.

What We Do Here

The Work We Are Called For in Somerville

Completed Work

10 Projects in Somerville

2024
Structural Inspections

5 Austin Street

On-site inspection of an existing deck's framing, posts, railing, and attachments, followed by design drawings for a like-for-like replacement within the same footprint.

2023

1070 Broadway Street

To ensure that the architectural drawings for the specified project are presented in a standardized format, subject to structural analysis, and provided with engineering-endorsed designs for optimal…

2022
Structural Inspections

42 Sargent Ave.

Site Visit a. Review site conditions. b. Assess the overall condition of the framing components and structures, including materials and construction quality. c. After the assessment, we will provide…

2025

16 Charles E Ryan Road

2024
Structural Inspections

168 Summer Street

Site Inspection: Conduct a visual inspection of the roof, attic space, and interior ceilings. Focus on areas where rafters have been modified or removed for skylight installation. Document existing…

2023
Structural Inspections

33-35 Fenwick Street

The proposed drainage system will be designed to manage the increased impervious area resulting from the driveway expansion. The system will include the necessary components to manage stormwater…

2023

1070 Broadway Street

To ensure that the architectural drawings for the specified project are presented in a standardized format, subject to structural analysis, and provided with engineering-endorsed designs for optimal…

2025

45 Pearl Street #3

Please take a moment to share your positive experience by leaving us a review on Google. Your feedback inspires us to reach new heights. https://g.page/r/CZIEYix1juLVEAE/review

2024

132 Central Street

NOTE: We prefer payments made through

2023

14-18 Mains Street

1. Our geotechnical contractor will conduct four soil borings using a Geoprobe around the settled areas, one at each corner. It is assumed that the soil boring areas will be accessible by the geotechnical machinery. DigSafe will be contacted before the soil boring activities. A soil report will be provided to be used in step #2. 2. Based on the findings in step 1, our engineers will prepare structural engineering drawings for a new slab, foundation, and columns for the front of the settled areas.

Nearby

Other Massachusetts Towns We Work In

See All Completed Projects →

Planning Something in Somerville?

Tell us what the building department has asked for and we will tell you what is actually required — before you commit to anything.

Request a Consultation Call (781) 540-0337
Call Book Quote