19-21 High Street
Revised and stamped architectural plans for a building at 19-21 High Street in Chelsea, MA, addressing basement column changes and deck post removal for brick wall attachment.
Lebra Engineering & Design has completed 4 projects in Chelsea between 2024 and 2025. Every drawing that needs one is stamped by a Massachusetts-licensed Professional Engineer.
Revised and stamped architectural plans for a building at 19-21 High Street in Chelsea, MA, addressing basement column changes and deck post removal for brick wall attachment.
We specifically are providing a Property Line Survey that includes the following details: • Location of the existing residential structure. • Retaining Wall Detail: Accurate horizontal and vertical…
We specifically are providing a Property Line Survey that includes the following details: • Location of the existing residential structure. • Retaining Wall Detail: Accurate horizontal and vertical…
Conduct a site inspection to determine if the roof structure can support the installation and load of solar panels.
Boston · Newton · Somerville · Framingham · Marlborough · Worcester · Arlington · Boston (Dorchester) · Burlington · Hopkinton · Westborough · Attleboro · Auburn · Boston (Jamaica Plain) · Boxford · Cambridge · Chelsea · Grafton · Hudson · Methuen · Northborough · Southborough · Swampscott · Watertown
Tell us what the building department has asked for and we will tell you what is actually required — before you commit to anything.
Request a Consultation Call (781) 540-0337