Condo Conversion Engineering Across Massachusetts
Condo Conversion Engineering

Turn Multi-Family Properties Into Registry-Ready Condominiums

Lebra Engineering & Design prepares Chapter 183A-compliant master deed floor plans and structural assessments for condo conversions across Littleton, Quincy, Greater Boston, and surrounding Massachusetts communities — built to satisfy your attorney, lender, and the Registry of Deeds.

Ch. 183A Master Deed Floor Plans Structural Assessments Registry of Deeds-Ready Docs Attorney & Lender Coordination

Master deed plans & structural review — PE-reviewed, within 1 business day.

Get Your Free Condo Conversion Consultation

Tell us about your building — we'll outline the engineering scope and timeline.

No obligation. We respond within 1 business day.

M.G.L. c.183A Documentation
PE-Stamped Structural Designs
Littleton & Quincy Project Experience
Attorney & Title Company Coordination
The Legal & Technical Side

What Massachusetts Condo Conversion Requires

Under Massachusetts General Laws Chapter 183A, converting a property to condominium ownership requires a master deed recorded at the Registry of Deeds, accompanied by floor plans that show the layout, location, dimensions, and boundaries of each unit — verified by a registered architect, engineer, or land surveyor.

Beyond the paperwork, a smart conversion starts with an honest structural and code assessment: fire separation between units, egress compliance, mechanical/electrical/plumbing separation, and any deferred maintenance that could slow down closing or scare off buyers.

Lebra Engineering & Design handles both sides — the certified floor plans your attorney needs for the master deed, and the structural due diligence that protects your investment.

Diagram of an example condo conversion master deed floor plan showing three units and a common stairwell

Illustrative only — your actual master deed floor plans are surveyed and certified for recording under M.G.L. c.183A.

What's Included

Full-Service Condo Conversion Engineering

Master Deed Floor Plans

  • Unit-by-unit dimensioned floor plans
  • Common area & limited common area mapping
  • Registry of Deeds-ready certification

Structural & Code Assessment

  • Fire separation & egress review
  • Structural condition report
  • Repair recommendations prior to closing

3D Scan-Based As-Builts

  • LiDAR scanning for accurate existing conditions
  • Faster, more precise floor plan production
  • Digital record for future renovations

MEP Separation Review

  • Utility metering & system separation
  • HVAC zoning per unit
  • Plumbing & electrical compliance

Attorney & Title Coordination

  • Direct collaboration on master deed package
  • Condo docs exhibit preparation
  • Responsive turnaround for closing deadlines

Renovation & Upgrade Design

  • Pre-conversion renovation design
  • Structural upgrades for code compliance
  • Design-build coordination
Our Process

From Multi-Family to Recorded Condominium

1

Free Consultation

We review the property, unit count, and your attorney's timeline.

2

3D Scan & Site Survey

We capture accurate existing conditions for each unit.

3

Structural Assessment

We evaluate code compliance, fire separation, and condition.

4

Master Deed Floor Plans

Certified, dimensioned floor plans prepared per Ch. 183A.

5

Recording Support

We coordinate with your attorney for Registry of Deeds submission.

Ready to Convert Your Property to Condos?

Send us the building and your goal. We'll confirm what the conversion requires and come back with a written proposal — typically within 1 business day.

Talk to an Engineer About My Conversion (781) 540-0337
Representative Work

Recent Condo Conversion Projects

Illustration of a triple-decker building being converted to condominiums
3-Unit Conversion

Triple-Decker Conversion

Structural assessment and master deed floor plans for a classic triple-decker converted to three condominium units.

Illustration of a mill building converted into loft condominiums
6-Unit Conversion

Mill Building Loft Conversion

3D-scan-based as-built floor plans and structural review supporting a historic mill building's conversion to lofts.

Illustration of a duplex building being converted to condominiums
2-Unit Conversion

Duplex Conversion

Fire separation upgrade design and certified floor plans for a two-family-to-condo conversion.

Illustrative examples of the project types we handle across Massachusetts. Not specific client engagements.

Why Developers & Owners Choose Lebra

Protect Your Closing Timeline

Registry-Ready the First Time

Certified plans built to Ch. 183A requirements reduce rejection risk.

Lender-Friendly Reports

Structural assessments formatted for lender and attorney review.

Faster Turnaround

3D scanning accelerates floor plan production for tight closing dates.

One Team, Full Scope

Structural, MEP, and documentation handled together.

Client Feedback

What Our Clients Say

5.0
★★★★★
36 Google reviews
See All Reviews on Google →
★★★★★

"As a remodeling contractor, having a structural engineer I can actually count on makes all the difference, and that's exactly what we've had with Marcelo and George at Lebra Engineering & Design. We've worked with them for over three years and they're our go-to on every project that needs structural support. They're responsive, efficient, and — most importantly — genuinely available when we need them. Remodels never go exactly to plan, and more than once we've hit a surprise after demo that meant rethinking the structural approach. Every time, Marcelo and George have jumped in quickly to help us modify the plan and keep the job moving. That kind of reliability is hard to find. Highly recommend them to any contractor or homeowner who needs structural engineering done right."

Jake Hubley
Jake Hubley
★★★★★

"Efficient and Effective Load-Bearing Wall Removal I recently hired Lebra Engineering to design a steel beam for a load-bearing wall removal project with a 26' - 6" span. I was thoroughly impressed with their service from start to finish. They prepared the necessary drawings and calculation reports for my building permit application with remarkable efficiency. Within a few short days, I had all the documentation I needed. Their work was professional, accurate, and clearly demonstrated their expertise in structural engineering. I wouldn't hesitate to recommend Lebra Engineering to anyone needing structural design services. Their combination of speed, quality, and expertise made the entire process smooth and stress-free."

Paulo Cesar
Paulo Cesar
★★★★★

"We had a great experience with Lebra Engineering & Design. Their engineers helped us improve the layout and functionality of our facility, and the design team brought creative ideas that truly enhanced the space. Highly recommend them for any project!"

Thomas Laskowski
Thomas Laskowski
★★★★★

"After working with Lebra Engineering & Design, I’m a true believer in their commitment to quality and excellence. They helped us with both the engineering and design aspects of a major renovation, and everything turned out perfectly. A great team to work with!"

Martin Marks
Martin Marks
★★★★★

"Top-notch engineers and designers! I had a great experience with Lebra Engineering & Design. Their team was always responsive, kept me in the loop, and delivered high-quality work on time. I’d definitely recommend them to anyone looking for engineering expertise!"

Jimmy Kulas
Jimmy Kulas
Condo Conversion FAQ

Frequently Asked Questions

What engineering documents are required for a Massachusetts condo conversion?
Chapter 183A requires a master deed with floor plans showing each unit's layout, dimensions, and boundaries, verified by a registered architect or engineer, and recorded at the Registry of Deeds.
Do you provide the certified floor plans required for the master deed?
Yes. We prepare and certify the as-built floor plans required under M.G.L. c.183A §8(c) for recording with your master deed at the Registry of Deeds.
Is a structural inspection required before converting to condos?
It isn't always legally mandated, but a structural assessment is strongly recommended — and often required by lenders and attorneys — to identify code issues, fire separation gaps, or deferred maintenance before recording.
How long does condo conversion engineering take?
Most floor plans and structural assessments are completed within 2–3 weeks, depending on building size and available documentation.
Can you work with our real estate attorney on the master deed package?
Yes. We regularly coordinate directly with real estate attorneys, surveyors, and title companies to deliver a complete, registry-ready master deed package.
Start Your Conversion

Get a Free Condo Conversion Consultation

We'll outline the structural, floor plan, and documentation scope needed for your closing timeline.

(781) 540-0337  |  contact [at] lebraengineering.com

Call Book Quote